866-997-2327 16257 Illinois Ave. Paramount, CA 90723.

Hospital ProjectsNetflix OfficeLAX AirportRams Stadium – InglewoodParking Sensors – IrvineDodger StadiumPacific Visions – Long Beach AquariumMetropolisCirca – Highrise DTLAUniversal Studios – Harry Potter

Hospital Projects

Subsurface Imaging Provides Concrete Services for Hospital Properties Subsurface Imaging is equipped to perform concrete services on hospital properties, which present their own specific challenges and requirements in order to contribute to a clean, safe medical environment. When performing these services, the Subsurface team pays close attention to cleanliness and sensitivities of the patients’ and…
February 22, 2020
Read more

Netflix Office

Subsurface Imaging performed X-ray, radar, and coring services at Netflix’s Hollywood office. Located at Hollywood’s Sunset Bronson Studios, this office spans 300,000 square feet across all 14 floors of the ICON tower. The 4,780-square-foot lobby welcomes visitors with an 80-foot-by-12-foot screen featuring Netflix’s video content, and an underground tunnel connects the parking structure and employee…
January 9, 2020
Read more

LAX Airport

Subsurface Imaging is performing radar and utility locating services for LAX’s Automated People Mover (APM) for the duration of the project, projected to open to passenger service in 2023. LAX broke ground on this electric train system in March 2019, and the guideway will include six stations in total—three inside the terminal and three outside.…
December 12, 2019
Read more

Rams Stadium – Inglewood

Subsurface performed various saw-cutting projects through out the stadium footprint. Subsurface continues cutting services at the brand-new Rams Stadium, slated to open in 2020.
September 19, 2019
Read more

Parking Sensors – Irvine

Subsurface performed more than 1,000 radar scans for new parking sensors at various parking structures in Irvine, CA. Structures included the Irvine Spectrum and Edwards Life Science properties, where each parking space is being retrofitted with cutting-edge parking sensor technology. Each pod installed will indicate open and occupied spaces in real time for patrons. In…
September 19, 2019
Read more

Dodger Stadium

Subsurface Imaging works on continued facility improvement and fan improvement projects throughout Dodger Stadium. Some projects have included bullpen data and electrical improvements, as well as press box renovations. Subsurface has performed X-ray, radar, and concrete coring at the stadium. We look forward to a continued relationship with the Dodgers and working on future projects…
September 17, 2019
Read more

Pacific Visions – Long Beach Aquarium

$53 Million Aquarium Expansion Long Beach, CA Subsurface Imaging was hired to complete concrete coring and Ground Penetrating Radar (GPR) services in the expansion of the Pacific Visions Aquarium in Long Beach, CA. The Pacific Visions project was a $53 Million expansion which required concrete coring and GPR work to safely expand the spaces in…
April 18, 2019
Read more

Metropolis

Concrete X-ray and GPR on Four Tower Plaza $1 Billion Ground-Up Build Downtown Los Angeles, CA Subsurface Imaging completed all the concrete x-rays and used Ground Penetrating Radar (GPR) for the $1 Billion, ground-up build of the Metropolis Highrise Plaza in Downtown LA. The Metropolis project consisted of 4 Highrise towers in a plaza (on…
April 18, 2019
Read more

Circa – Highrise DTLA

$500 Million New Build Downtown Los Angeles, CA Subsurface Imaging provided all the concrete X-rays, and performed Ground Penetrating Radar (GPR) services on the Circa Highrise project in Downtown LA. The Circa project was a $500 million build comprised of two 35-story mixed use (living and retail) high rise buildings, and Subsurface Imaging took concrete…
April 23, 2019
Read more

Universal Studios – Harry Potter

Hollywood, CA Subsurface Imaging provided all the concrete coring and Ground Penetrating Radar (GPR) services needed to complete the Harry Potter World expansion at Universal Studios Hollywood. On this project, subsurface imaging did GPR work and also performed over 300 concrete coring penetrations to place the hand railings and line guards throughout the park.
April 23, 2019
Read more